---
title: "Changing Report Parameters"
canonical: "https://docs.rubiconwater.com/space/RptNC/1987511132/Changing%20Report%20Parameters"
format: markdown
---
Make changes to the parameters of a scheduled report.

**To change report parameters:**

1. In the Scheduled Reports and Tasks module, select the report whose parameters you want to change.
2. On the Parameters tab, click **Edit** to make the parameters editable.
3. Change the parameter values as required.
4. Click **Save** to save your changes.

---