# Report Description

The Running Sheet report lists all the flow changes for a specific plan or date range. When outlets or regulators are manually controlled, the Running Sheet report is used to determine what changes need to be made at outlets and regulators to provide the flows required for the plan.

> ℹ️ **Note**
> ℹ️ 
> ℹ️ The Running Sheet report is generated by traversing the network starting at the top regulators defined for the plan area. If you have not specified a top regulator for your planning area, the report cannot be generated.

The Running Sheet does not exactly match the regulator flow changes specified in the plan. Instead, you can set a change interval in hours and the report will calculate what the regulator flow should be at specific times during the day.

> ℹ️ **Example**
> ℹ️ 
> ℹ️ - If you set the **Change Interval** to *3* hours, the report will give you the flow settings to apply at three hourly intervals (e.g. 09:00, 12:00, 15:00, 18:00) and so on until no further changes are required.
> ℹ️ - If you set the **Change Interval** to *6* hours, the change times will be at six hourly intervals such as 0:600, 12:00, 18:00 and so on.

> ℹ️ **Note**
> ℹ️ 
> ℹ️ The change interval defaults to six hours, but you can change this default by using the **Default Change Interval** parameter.

# Report Parameters and Options

If you are logged in as a planner, the Running Sheet will be based on the planning area or group that you selected when you logged in. If you are not using planning, or if you are not logged in as a planner, you can choose an area or group for the report.

| **Parameter** | **Description** |
| --- | --- |
| Planning Area or Area/Group | Select the planning area/ planning group for which to run the report. If you are not using planning, select the area or group.<br>DMS looks for any finalised plans for the specified area or group. |
| Plan Date | Select the finalised plan for which to run the report, or pick a date if you are not running the report for a plan. |
| None/Range/Group/Section | These options allow you to refine the area for which the report is run:<br>- **None** - run the report for all regulators and outlets downstream of the selected *Start regulator*.
- **Range** - run the report for a subset of the network bounded by a *Start regulator* and an *End regulator*
- **Group** - run the report for a field group. Use this option if you have set up field groups that are serviced by different field operators and you need to provide a sheet for each field group.
- **Section** - like the Group option, you can choose this if your Planning Group contains Sections which are a type of area. Sections are typically used to define individual channels within a larger planning area. |
| Start Regulator | Specify a start regulator from which to start the running sheet report. The report will find all the regulators in your selected scope that are downstream of the start regulator. |
| End Regulator | Specify an end regulator. Only required if you are running the report for a range of regulators.<br>The report will find all the regulators in the selected scope that are downstream of the start regulator and upstream of the end regulator. |
| Change Interval | Specifies how often the regulator flow is reported. Use this to control how precisely you want to match the changes of flow through the regulators to the actual ordered demand.<br>Change times begin from the start of the first order. |
| Regulator Snapshot Time | Specifies the time of day on which regulator flow is reported.<br>There is a system parameter, *Regulator Snapshot Time*, that sets the default snapshot time. |
| Report | Specify what customer details to include in the orders part of the report:<br>- Customer Name - include the customer's name
- Customer Phone - include the customer's phone number |
| Print Messages On | Objects can have messages attached to them. Select which types of message to print.<br>- Regulators - print messages attached to regulators
- Outlets - print messages attached to outlets
- Orders - print messages attached to orders. |
| Report Print regulators Only | Prints details only for regulators that have the Print Regulator attribute set to *Print in Running Sheet*or that have orders below them? |

# Report Output

The report output lists regulator events for each regulator in the report area and, for each regulator, the order events downstream of the regulator.

## Report Style

There are two styles of Running Sheet report output. The running sheet style is configured in the [https://rubiconwater.atlassian.net/wiki/spaces/CFGNC/pages/2001012712](https://rubiconwater.atlassian.net/wiki/spaces/CFGNC/pages/2001012712) by the setting system parameter *IMS-style running sheet* to TRUE or FALSE.

The IMS style report includes only orders that overlap with the plan day and shows a diagrammatic view of the order start and stop times. See <u>[Order date range symbols on the Running Sheet](https://support.rubiconwater.com/help/dms/content/topics/reports/rpt_runningsheet.htm#Order)</u>.

## Report navigation

You can navigate the PDF report output by using the bookmarks panel on the left of the report. Click on a channel or regulator name to jump to that section of the report.

Toggle the visibility of the bookmarks panel by clicking the **Bookmarks** icon to the left of the report page.

## Regulator details

| **Field** | **Description** |
| --- | --- |
| Channel/section | Channel, reach or section where this regulator is located. The running sheet report lists regulators in each channel then moves to the next channel. |
| Regulator name | Regulator name |
| Regulator description | Regulator description |
| Flow rate by day | Flow rates at midnight on the plan day and the previous and next days |
| Change times | Regulator flow change times calculated from the **Change Interval** parameter |
| Flows at change times | Flow setting at each change time |
| Loss | Loss set on the channel (if relevant) |
| Messages | Any message set on the regulator if you have elected to print regulator messages. |
| Time/Actual flow | Space to record the time and flow details at the regulator |

## Order Details

| **Field** | **Description** |
| --- | --- |
| Operator name | Outlet operator's name |
| Operator phone | Outlet operator's phone number and mobile phone number (if available). |
| Outlet name | Outlet name |
| Outlet type | Outlet object type code |
| Order start time/date | Estimated finish time and date of order |
| Order finish time/date | Estimated finish time and date of order |
| Flow links | Outlets with linked flows |
| Duration | Flow duration in hours. Multiflow orders are marked as such and the details of each flow are listed. |
| Flow rate | Flow rate in ML/day |

## Regulator Type Symbols on the Running Sheet

The Running Sheet marks offtake regulators with a distinctive line pattern at the bottom of the table cell for that regulator. DMS identifies offtake regulators by determining whether or not they are on the main channel. Regulators on branch channels are marked as offtake regulators.

| **Symbol** | **Description** |
| --- | --- |
| ![image](media://ddf2f4f4-952f-4357-a561-e271456ea3bc) | Offtake regulator |
| ![image](media://e8793d30-f7db-4c83-ab93-abfc3f747de5) | Other regulators |

## Order date range symbols on the Running Sheet

Note that these symbols displayed only on the IMS style of running sheet report.

The box symbol beside orders indicates the order start and end time. A double line marks an event that happens on the report day. If the whole order falls outside of the report day, no box is displayed.

Note that the plan day starts at 00:00:00 and continues until one minute either side of midnight.

| **Symbol** | **Description** |
| --- | --- |
| ![image](media://da86b7d2-e29e-44ac-91d7-b0135b21823e) | The order starts and ends within the plan day or no more than one minute after midnight. |
| ![image](media://99a771cc-b0de-4b54-90dd-0c6c5d1e6b6b) | The order starts on the plan day and continues after the plan day. |
| ![image](media://7426e833-930d-43c9-add2-ce13983c904b) | The order starts before the plan day and ends on the plan day |
| ![image](media://29c85ec2-ba1d-45b8-ad19-835d5a4d0a31) | The order starts before the plan day and continues after the plan day |

# Scheduling the Running Sheet Report

See [https://rubiconwater.atlassian.net/wiki/spaces/RptNC/pages/1987511013](https://rubiconwater.atlassian.net/wiki/spaces/RptNC/pages/1987511013) for more details of report scheduling.

The Running Sheet report can be scheduled to run regularly. You can use the **Is System Used for Planning** parameter to control how the report dates are set. 

If the parameter is set to *Yes* you must select a plan for the report. The default will be the latest finalised plan date.

If the parameter is set to *No* there will be an **Operation Date** field available for the Running Sheet report. This may have a default value but you can set any date that you choose.

- If the current day is within the latest finalised plan, then that date will be the default Operation Date
- Otherwise the start date of the latest finalised plan (if available) will be used as the default Operation Date.
- If there is no finalised plan available the default date will be blank.